YEAR:
2021
CLIENT:
vanPanhuis Installatietechniek
SERVICES PROVIDED:
Design and engineering
SIZE:
62.000 m2
TOTAL BUILDING COSTS:
€100 million
STATUS:
in construction
Green Future Hessing Venlo – vanPanhuis img1

Assignment:

Modeling and coordinating the mechanical systems of the new distribution center of Hessing from design to construction stage. Working together with all the disciplines and making sure that all the special systems will be optimized for building on site. Because this factory is for processing food, there are high hygienic regulations for the mechanical systems. 

Result:

Ongoing

Inside of Green Future Hessing Venlo – vanPanhuis image
Outside of Green Future Hessing Venlo. Project 3
Bird view image of Green Future Hessing Venlo Image 4